How to Build a Rock Wall on a Steep Slope

104 13
    • 1). Create an outline of where the wall should be, using a measuring tape. Dig a rough outline into the slope with a shovel. Remove as much dirt as necessary to get a 24-inch indent that the wall can be built within. Dig to 2 feet below ground level.

    • 2). Place the steel rods roughly in the center of the indent you just dug out of the hill, starting at one end. Space them 2 feet apart from each other.

    • 3). Knock the rods 1 foot into the ground, using the sledgehammer. This will be a support to keep the wall from shifting due to weight from the ground that will be stacked behind it.

    • 4). Mix the mortar by placing 11 shovels of sand and one bag of type II masonry mortar into the cement pan. Add water by filling a 5-gallon bucket and adding it to the sand and cement mix. Using the shovel, thoroughly mix the water into the mortar mix. When ready, the mix will be a uniform gray and have the consistency of a thick pudding.

    • 5). Add the mortar to the entire bottom of the indent. This secures the steel rods in place and allows for the first stones to be laid for the wall's foundation. The cement should come up to ground level. This will create a strong base that will keep the wall from falling over from pressure that will build up behind it as the ground behind it fills in any spaces and gaps over time.

    • 6). Mix another batch of mortar. Using the trowel, add mortar to the back of some field stones and lay them into the base of the indent, mortar side down. Fit them tightly together like a puzzle. They don't have to fit perfectly, but they should be as close as possible.

    • 7). Lay the stones across the entire base of the indent, fitting the rods between the stones so that they are hidden from view.

    • 8). Stack the rest of the field stone on top of the base that was just created. Place mortar on the bottom of each stone before it is laid into place. Stack the stone to the desired height. Wait 24 hours.

    • 9). Fill in any gaps behind the stone wall with the dirt that was excavated from the slope before the base was laid. This will help prevent water collection.

Subscribe to our newsletter
Sign up here to get the latest news, updates and special offers delivered directly to your inbox.
You can unsubscribe at any time

Leave A Reply

Your email address will not be published.